Set r & d, sales, services in one of the cellulose ether product operators

CN/EN

 

15203125670

If you have any requirement, please contact us, we will provide you with free samples and related materials

contact:Mr. Li       telephone:+86-15203125670         Mail box:15203125670@163.com

Shengheng new material technology co. LTD  300.CN        冀ICP备19006901号-1 

NEWS CENTER

Set raw materials, technical services, engineering contract in one of the modern emerging enterprises

How to use putty powder, putty powder use method and matters needing attention

Page view
[Abstract]:
Usage of putty powder:
1, the base should be solid, clean, roughly smooth, no clear water, the strength of the base should be greater than or close to the strength of putty.
2. The base course with strong water absorption should be moistened with water or sprayed with glue for sealing treatment before blowing putty (consistency should be suitable for construction).
3, new plastered cement wall should be in the maintenance period after scraping putty.
4. Stir evenly according to the proportion of putty powder: water = 1:0.5, let it stand for 10 ~ 20 minutes and stir evenly again before use.
5, with steel scraper or spatula according to the conventional batch scraping, scraping coating times can not be too much, usually batch scraping twice, the second coating in the former coating dry condition can be constructed.
6. The thickness of batch scraping is 0.8 ~ 1.5mm, and the dosage is 1 ~ 1.5kg/㎡.
7, putty dry, with 320# or 240# sandpaper for polishing, as soon as possible paint or paste wallpaper.
8, dosage: under the condition of formation at the base level, each kilogram of putty powder can be about 0.8 -- 1.2 square meters (two batches) of the formation of the wall.
Matters needing attention when using putty powder:
1. Keep it waterproof and moisture-proof. The storage period is six months.
2. The construction temperature is above 0℃. Putty powder should be used within 4-5 hours after it is adjusted into a paste to avoid prolonged deterioration.
3. Putty powder shall not be used on the same construction surface with other putty to avoid chemical reaction and chromatic aberration
Usage of putty powder:
1, the base should be solid, clean, roughly smooth, no clear water, the strength of the base should be greater than or close to the strength of putty.
2. The base course with strong water absorption should be moistened with water or sprayed with glue for sealing treatment before blowing putty (consistency should be suitable for construction).
3, new plastered cement wall should be in the maintenance period after scraping putty.
4. Stir evenly according to the proportion of putty powder: water = 1:0.5, let it stand for 10 ~ 20 minutes and stir evenly again before use.
5, with steel scraper or spatula according to the conventional batch scraping, scraping coating times can not be too much, usually batch scraping twice, the second coating in the former coating dry condition can be constructed.
6. The thickness of batch scraping is 0.8 ~ 1.5mm, and the dosage is 1 ~ 1.5kg/㎡.
7, putty dry, with 320# or 240# sandpaper for polishing, as soon as possible paint or paste wallpaper.
8, dosage: under the condition of formation at the base level, each kilogram of putty powder can be about 0.8 -- 1.2 square meters (two batches) of the formation of the wall.
Matters needing attention when using putty powder:
1. Keep it waterproof and moisture-proof. The storage period is six months.
2. The construction temperature is above 0℃. Putty powder should be used within 4-5 hours after it is adjusted into a paste to avoid prolonged deterioration.
3. Putty powder shall not be used on the same construction surface with other putty to avoid chemical reaction and chromatic aberration
 
 
Next article: