Set r & d, sales, services in one of the cellulose ether product operators
15203125670
If you have any requirement, please contact us, we will provide you with free samples and related materials
contact:Mr. Li telephone:+86-15203125670 Mail box:15203125670@163.com
Shengheng new material technology co. LTD 300.CN 冀ICP备19006901号-1
NEWS CENTER
Set raw materials, technical services, engineering contract in one of the modern emerging enterprises
How to use putty powder, putty powder use method and matters needing attention
Page view
[Abstract]:
1, the base should be solid, clean, roughly smooth, no clear water, the strength of the base should be greater than or close to the strength of putty.
2. The base course with strong water absorption should be moistened with water or sprayed with glue for sealing treatment before blowing putty (consistency should be suitable for construction).
3, new plastered cement wall should be in the maintenance period after scraping putty.
4. Stir evenly according to the proportion of putty powder: water = 1:0.5, let it stand for 10 ~ 20 minutes and stir evenly again before use.
5, with steel scraper or spatula according to the conventional batch scraping, scraping coating times can not be too much, usually batch scraping twice, the second coating in the former coating dry condition can be constructed.
6. The thickness of batch scraping is 0.8 ~ 1.5mm, and the dosage is 1 ~ 1.5kg/㎡.
7, putty dry, with 320# or 240# sandpaper for polishing, as soon as possible paint or paste wallpaper.
8, dosage: under the condition of formation at the base level, each kilogram of putty powder can be about 0.8 -- 1.2 square meters (two batches) of the formation of the wall.
Matters needing attention when using putty powder:
1. Keep it waterproof and moisture-proof. The storage period is six months.
2. The construction temperature is above 0℃. Putty powder should be used within 4-5 hours after it is adjusted into a paste to avoid prolonged deterioration.
3. Putty powder shall not be used on the same construction surface with other putty to avoid chemical reaction and chromatic aberration
Usage of putty powder:
1, the base should be solid, clean, roughly smooth, no clear water, the strength of the base should be greater than or close to the strength of putty.
2. The base course with strong water absorption should be moistened with water or sprayed with glue for sealing treatment before blowing putty (consistency should be suitable for construction).
3, new plastered cement wall should be in the maintenance period after scraping putty.
4. Stir evenly according to the proportion of putty powder: water = 1:0.5, let it stand for 10 ~ 20 minutes and stir evenly again before use.
5, with steel scraper or spatula according to the conventional batch scraping, scraping coating times can not be too much, usually batch scraping twice, the second coating in the former coating dry condition can be constructed.
6. The thickness of batch scraping is 0.8 ~ 1.5mm, and the dosage is 1 ~ 1.5kg/㎡.
7, putty dry, with 320# or 240# sandpaper for polishing, as soon as possible paint or paste wallpaper.
8, dosage: under the condition of formation at the base level, each kilogram of putty powder can be about 0.8 -- 1.2 square meters (two batches) of the formation of the wall.
Matters needing attention when using putty powder:
1. Keep it waterproof and moisture-proof. The storage period is six months.
2. The construction temperature is above 0℃. Putty powder should be used within 4-5 hours after it is adjusted into a paste to avoid prolonged deterioration.
3. Putty powder shall not be used on the same construction surface with other putty to avoid chemical reaction and chromatic aberration
Previous article:
How is putty layer craze caused, how should handle?
无
Next article: